Do You Need a Switchboard Upgrade Before Installing Solar or EV Charging?
April 28, 2025
With the rapid uptake of rooftop solar photovoltaics (PV) and electric vehicle (EV) charging in Australia, many homeowners are discovering that their existing switchboards simply aren’t up to the task. Switchboard upgrades aren’t just an optional extra—they're often a necessary prerequisite to ensure safety, compliance with Australian electrical standards, and the long-term performance of your solar or EV charging system.
In this article, we’ll explore why modern renewable and electrification technologies demand a capable switchboard, how to recognise when an upgrade is due, and whether you can proceed without one.
Why Modern Solar and EV Systems Need a Capable Switchboard
Old switchboards were built on the assumption that electricity only flowed in—powering lights, ovens and airconditioning. Now, solar inverters push energy back out, and EV chargers draw high currents continuously. Together, they transform your switchboard into a two-way highway that many legacy boards simply can’t support.
Managing Higher Currents and Two-Way Flow
Higher Peak and Continuous Currents
Solar export currents: When your panels generate more than you use, inverters can push up to 6 kW (≈25 A) back to the grid.
Continuous EV charging: A typical home charger draws 15 A (3.6 kW) to 32 A (7.2 kW) for hours at a time—equivalent to running two heavy ovens together.
Combined peaks: Running airconditioning, pool pumps, or electric ovens alongside solar export or EV charging can easily exceed an old 60 A or 80 A main switch.
Quick tip:If you’ve ever had breakers trip when turning on high-draw appliances, your switchboard is already at its limit—adding solar or EV charging without an upgrade almost guarantees more nuisance trips.
New Safety and Protection Requirements
Australia’s Wiring Rules (AS/NZS 3000) and Clean Energy Council guidelines now demand extra safeguards:
RCDs (Residual Current Devices): Type A for standard AC circuits; Type B for DC-leakage detection in solar and EV systems.
SPDs (Surge Protection Devices): Protect against lightning and grid transients—essential in storm-prone coastal suburbs.
AFCIs (Arc-Fault Circuit Interrupters): Detect dangerous arcs in DC solar wiring before they become fire hazards.
Signs Your Switchboard Needs an Upgrade
Even before you start planning your solar or EV charger installation, a quick visual and functional check of your switchboard can save you headaches (and expense) down the track. Here are the key warning signs to look out for.
Age & Physical Condition
An old or visibly damaged switchboard is rarely up to modern safety and performance standards.
Frequent nuisance trips: If your lights flicker or circuits trip when you turn on high-draw appliances (like airconditioning or ovens), it often indicates worn breakers or degraded busbars.
Rust, corrosion, or overheating: Exposure to coastal salt air (especially in Australia’s beachside suburbs) can corrode metal enclosures, while overheating leaves brown scorch marks around breakers.
Yellowing plastic or cracked panels: UV radiation and years of heat cycles can embrittle plastic covers, risking dust ingress and accidental contact with live parts.
Obsolete components: Switchboards older than 20 years often lack key features like dedicated DC isolators, leaving them non-compliant with today’s solar inverter requirements.
Insufficient Capacity
Full breaker slots: No spare ways means no room for the required RCDs, DC isolators or dedicated EV breaker—forcing installers to splice onto existing circuits (a code violation).
Undersized main switch: Many older homes still use 60 A or 80 A mains. A typical 6 kW solar system or 7.2 kW EV charger alone can approach or exceed that rating when combined with household loads.
Single-phase only supply: If you want to install a 22 kW (32 A per phase) three-phase charger, a single-phase board simply can’t handle the current balance.
Missing Protective Devices
No RCD (Residual Current Device): Since 2011, every new circuit in Australia must be protected by a 30 mA RCD. Boards without RCDs put users at risk of electric shock.
Absence of SPDs (Surge Protection Devices): Without SPDs, voltage spikes from lightning or grid switching can fry sensitive inverter electronics and charger controls.
Lack of AFCIs (Arc-Fault Circuit Interruption): To prevent fires caused by loose DC connections (common in solar arrays), many jurisdictions now require DC-sensitive AFCIs on PV circuits.
Upgrading Before Solar Panel Installation
Before the first solar panel is mounted on your roof, your switchboard must be ready to safely handle the system’s specific electrical demands. A thorough pre-installation upgrade not only ensures compliance with regulations but also maximises system performance and longevity.
Electrical Load Assessment
An accurate load assessment determines whether your existing main switch and busbars can accommodate both household demand and solar export.
Calculate existing demand
Review your historical electricity bills to identify peak household loads (e.g., airconditioningditioning, pool pump, electric oven).
If peak demand approaches your main switch rating, there’s no room left for solar export currents.
Determine solar inverter capacity
Typical residential inverters range from 3 kW to 10 kW.
Match inverter size so that export plus household loads never exceed your main switch’s continuous rating.
Simulate two-way flow
Use load-demand calculators (often provided by CEC-accredited installers) to model power flow under different conditions—cloudy day vs. midday sun.
Confirm that reverse power (export) remains within your distributor’s allowable limit (commonly 5 kW on single-phase).
Switchboard Enhancement Options
Depending on the assessment outcome, you may choose one of two primary upgrade paths:
Adding New Sub-Boards
Separate enclosure: Install a small “satellite” switchboard near the main board, with its own RCDs, DC isolator, surge protection, and space for PV string breakers.
Pros
Minimal disruption to existing circuits.
Clear segregation of DC and AC circuits.
Often faster and less costly than a full replacement.
Cons
May still require a main switch upgrade if export currents are high.
Adds extra wall penetrations and wiring runs.
Full Switchboard Replacement
Modern, modular design: Replace the entire board with a compliant metal enclosure featuring ample breaker ways, integrated SPDs, RCDs/AFCIs, and labelled PV and general-purpose circuits.
Pros
Future-proof for additional loads (EV charger, battery storage).
Cleaner installation with built-in surge protection and ducting.
Often includes superior corrosion resistance and UV-stable materials for Australian conditions.
Cons
Higher upfront cost and longer installation time.
Requires relocating wiring and short power outage during switchover.
Regulatory Approvals and Connections
Navigating approvals smoothly avoids delays and extra fees.
Electricity distributor notifications
For systems ≤ 5 kW on single-phase, many distributors allow “deemed approval” when installed by a CEC-accredited installer.
Above 5 kW (or on three-phase), formal application and network impact study may be required.
Clean Energy Council (CEC) compliance
Your installer must submit a CEC connection application with evidence of switchboard compliance to AS/NZS 3000.
Approved equipment (inverter, isolators, SPD) must be on the CEC’s published lists to qualify for STCs and feed-in tariff eligibility.
Local government or heritage considerations
In some council areas—particularly heritage-listed suburbs—switchboard locations and enclosures may need aesthetic approval.
Early consultation with your council or body corporate can preempt design rework.
Upgrading Before Installing an EV Charger
Electric vehicles are surging in popularity across Australia, and a home charger is often the first step toward convenient, cost-effective fueling. However, EV chargers impose continuous, high-current demands that many legacy switchboards weren’t designed to manage. Upgrading your switchboard beforehand ensures safe operation, regulatory compliance, and the potential to leverage smart-charging features.
Charger Load Characteristics
Understanding how much power your charger will draw—and for how long—is the foundation of any upgrade decision.
Continuous vs. Intermittent loads
Unlike appliances such as ovens or kettles, which cycle on and off, EV chargers draw a steady current for the full duration of a charging session (often 2–8 hours).
Impact on household demand
A 7.2 kW charger adds the equivalent load of two heavy-duty ovens running simultaneously.
Switchboard Readiness Checklist
Before booking an electrician, run through this checklist to identify upgrade needs.
Spare Ways for a Dedicated Circuit
Ensure at least one free breaker slot for the EV charger’s dedicated MCCB or MCB.
If none are available, plan for additional ways via:
Adding a small sub-board
Replacing the entire board
Main Switch Rating vs. Charger Current
Confirm your main switch (or service fuse) rating can handle: Household peak load + Charger continuous current
Example: 100 A main switch + 32 A charger ≤ 132 A total peak capacity must be within supply limits.
RCD Protection
AS/NZS 3000 mandates RCD protection for all new circuits. For EV circuits, use:
Type A RCDs for AC-only chargers
Type B RCDs for chargers with DC leakage potential (e.g., bi-directional or V2G-ready)
Surge Protection (SPD)
Install a Type 2 SPD in the switchboard to guard against transient overvoltages from storms or grid switching—critical in Australia’s lightning-prone regions.
Conductor Sizing and Cable Run
Verify cable cross-section:
6 mm² copper for up to 32 A single-phase
10 mm² copper for sustained runs or where voltage drop is a concern
Check route: avoid long, convoluted runs that increase voltage drop and heat buildup.
Outdoor-Rated Enclosures (If Applicable)
If the charger or sub-board sits outdoors, use IP56 or higher–rated enclosures to withstand rain, dust, and salt spray in coastal areas.
Smart Charging and Load Management
Upgrading your switchboard is just the start—integrating smart features can optimise charging costs, grid interaction, and even solar self-consumption.
Dynamic Load Shedding
What it does
Automatically throttles the charger’s power draw if household demand spikes (e.g., airconditioning turning on), preventing nuisance trips.
Benefits in Australia
Avoids late-afternoon overloads when airconditioningditioning and vehicle charging coincide.
Eliminates the need for an oversized main switch if your electrician programmes safe load limits.
Time-of-Use (TOU) Optimisation
TOU tariffs
Many Australian distributors offer lower rates overnight. A smart charger can delay or ramp up charging during off-peak windows.
Implementation
Charger’s inbuilt scheduler or integration with a home energy management system (HEMS).
Voice or app control to adjust schedules on the fly.
Solar Self-Consumption Prioritisation
Solar + EV synergy
If you have—or plan to install—solar panels, an intelligent EV charger can preferentially draw from daytime solar generation.
How it works
Real-time monitoring of solar output via CT clamps on your switchboard.
Charger ramps up when panels exceed household needs; throttles back when consumption outpaces generation.
Future-Proofing for Battery Storage and V2G
Battery-ready switchboards
Leave spare ways and ensure your board supports DC-coupled battery inverters alongside AC chargers.
Vehicle-to-Grid (V2G) considerations
V2G chargers require full bi-directional protection (Type B RCD, SPD coordination).
Early switchboard upgrades can preempt complex retrofits when V2G adoption grows.
Can You Install Solar or EV Chargers Without a Switchboard Upgrade?
In some cases, homeowners can add small solar arrays or lower-power EV chargers to their existing switchboard without a full upgrade—but only if the board already meets current Australian safety and capacity requirements. Below, we explore when minimal changes may suffice, the risks of proceeding without an upgrade, and why a professional assessment is non-negotiable.
When Minimal Changes Are Possible
Spare Capacity Exists
Your switchboard has free breaker “ways” and a main switch rated high enough to absorb the extra load.
Example: A 60 A main switch plus a 3 kW (≈12 A) solar inverter and no other major simultaneous loads.
Low-Power Systems
Portable or plug-in EV chargers limited to 10 A–13 A may draw directly from an existing general-purpose outlet (though this is a temporary solution and not ideal for daily use).
Micro-inverters or small (≤ 3 kW) solar systems often integrate into existing RCD-protected circuits.
Existing Protection Meets Standards
Your board already has:
30 mA RCD protection on all circuits (Type A or B where DC leakage is possible).
A Type 2 Surge Protection Device (SPD) installed.
Labelled, segregated AC and DC circuits for easy maintenance.
Risks of Forgoing an Upgrade
Overloading and Nuisance Tripping
An undersized main switch or busbar can lead to frequent breaker trips—disrupting your daily routine and potentially damaging sensitive inverter electronics.
Safety Hazards
Missing DC-sensitive RCDs or AFCIs on solar strings can create fire or electrocution risks, especially under Australian sun-driven temperatures.
Non-Compliance and Financial Penalties
Failing an electrical inspection can void your eligibility for Small-scale Technology Certificates (STCs) and feed-in tariffs.
Insurance claims may be rejected if an electrical fault occurs in a non-compliant installation.
Professional Assessment Is Key
Engage a CEC-Accredited Electrician
They’ll provide a formal switchboard report, detailing capacity, protection gaps, and upgrade recommendations.
Obtain Written Compliance Certificates
Ensure each new circuit is certified under the Wiring Rules and CEC guidelines—essential for warranties, rebates, and insurance.
Plan for Future Expansion
Even if you start small, leave space and budget for potential EV charging or battery storage down the track.
A modest switchboard retrofit (e.g., adding spare ways and SPDs) now can save you from a full replacement later.
A reliable switchboard is the cornerstone of any successful solar or EV charging setup. By spotting signs of wear, assessing your board’s capacity, and choosing the right upgrade path—whether a simple sub-board or a full replacement—you’ll ensure compliance, safety, and optimal system performance. While small, low-power installations may sometimes require only minor tweaks, a Clean Energy Council-accredited electrician’s assessment is invaluable for future-proofing. Invest in a professional upgrade now to unlock maximum solar self-consumption, seamless EV charging, and peace of mind as you embrace Australia’s clean energy transition.
contact our surveyors
Get in Touch
If you have any enquiries or would like to request a quote, feel free to fill out the form or give us a call and a surveyor will get back to you as soon as we can.
0459 463 941
Northern Rivers NSW - Service Area
Request A Quote
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Get In Touch
Contact Our Electricians Today
Don’t settle for subpar electrical work—choose Allround Electrical for excellence you can trust. Contact us today to request a quote or book a service.